by

Clientele

PROJECT DESCRIPTION

CUSTOMER

YEAR

REMARKS

Fabricating, to supply and to Install of One incinerator of 45kg/hour (NYWE 0045).

St.francis Comunity Hospital.

September,2013

Completed

Fabrication,supplying and Installation of One incinerator of 75kg/hour (NYWE 0075).

Moi Teaching and Referral Hosptal (MTRH)

2011/2012

Completed

Extensive repair of existing incinerator and building of incinerator house.

PATH-KENYA,Meru level five Hospital.

2011/2012

Completed

Fabrication, supplying and Installation of four (4) incinerators of 45kg per hour. (NYWE 0045)

Warren Enterprises Limited

Aug. 2010

Completed

Fabrication, supplying and Installation of three (3) incinerators of 45kg per hour. (NYWE 0045).

Altec Engineering Works

Aug. 2010

Completed

Fabrication, supplying and Installation of one (1) incinerator of 75kg per hour. (NYWE 0075).

Bugando Hospital in Mwanza-Tanzania

2001

Completed

Installation of Afrodden milk plant (Lala line)

Afroden Industries Ltd

2003-2005

Completed

Installation of Afroden milk plant (Fresh milk line)

Afroden Industries Ltd

2004

Completed

Installation of Pipe work at Nairobi South Power station

Project: sub-contracted by A. I. (Urmston) Ltd

1997

Completed

Installation of Edible piping work (S/Steel project)

Unilever Kenya

1993

Completed

Piping works using Argon Gas (TIG)

Boc Kenya Ltd

2005

Completed

C.I.P. Plant Installation at Nyahururu K.I.C.C.

Sub-contracted by Engineering Process Ltd

2005

Completed

Fabrication of gutters and installation

Frigoken Ltd

2006

Completed

Fabrication of Structural shade

Githunguri Dairy Farmers

Co-operative Society.

2007

Completed

Animal feed mixer.jpgGM 25 posho mill.jpgGM 30 posho mill.jpgINCINERATOR IN OPERATION.jpgMaize roller huller.jpgMeru Incinerator.jpgMobile Maize sheller.jpgMuthokoi huller2.jpgNSP SOAP PLODDER.jpgNYWE0075 INCINERATOR.jpgRack Candle machine.jpgRester candle machine.jpgWHITE ASHIN INCINERATOR.jpg